EOG – Dywity

January 2024

Very good pace of work on the school building in Bukwałd, where one of the school buildings is planned to be put into use, where a full range of internal works have already been carried out, consisting of replacing windows and doors with new ones, insulating the attic floor above the attic with mineral wool, insulating the sloping roof of the attic utility room with mineral wool, reconstruction of the buildings and the attic floor. Work is underway to insulate the external walls of the above-ground floors.